
What grants are available?
Grants are fixed for each type of measure as indicated in the table below. Grant approval must be in place before any purchase of materials or commencement of measures undertaken. Grants are paid after the measures are completed and the contractor has been paid by the homeowner. In the instance where the cost of the work (vat inclusive) is less than the fixed grant amount, the actual cost will be reimbursed.
Types of grant available
| Measure | Category | Grant* |
| Roof | Roof insulation | €250 |
| Wall | cavity wall insulation | €400 |
| Internal wall dry-lining | €2,500 | |
| External wall insulation | €4000 | |
| Heating controls | High Efficiency Gas or Oil fired Boiler with Heating Controls UpgradeBER Assesment | €700 |
| Heating controls upgrade | €500 | |
| BER Assessment | A Before works and an After works BER assessment | €200 |
*Please note that while you are entitled to apply for each Measure there is a minimum requirement that the grant amount in the first application must be €500 or greater. The BER grant cannot form part of this €500 amount.

